Coordinate the structure around the project
Buildings are among Groupe Tremblay’s fabrication applications.
Requirements change with the state of the drawings, interfaces with other trades, site access, and schedule. The proposed scope must therefore come from the project documents rather than a broad promise that every stage is included.
A technical path may connect several stages.
Prepare a useful first discussion
Tell us the structure type, drawing status, requested scope, project location, and schedule. The team can then confirm whether the engagement fits its capabilities and identify what additional information is required.