K2: scaffolding adapted to the project context

Learn about K2, the Groupe Tremblay division associated with the design and installation of project-specific scaffolding.

Custom industrial scaffolding arranged around a pipe rack

K2’s role

K2 is the Groupe Tremblay division dedicated to creating and installing scaffolding adapted to project situations and needs. K2 also designs and installs customized solutions.

Scaffold crew assembling a protected access level

What to share at the outset

An initial inquiry should identify the area requiring access, planned work, known physical constraints, location, and schedule. That information frames the discussion; the configuration must be determined after review.

Scaffold planner reviewing an industrial access requirement
Next step

Need to plan temporary access?

Describe the work area, activity to be supported, and known constraints. The team can confirm whether design and installation fit the engagement.

Share the scaffolding requirement